Inspection planning
Use account history, locations, prior findings, loss experience, business changes and renewal dates to prioritize survey work.
Record the reason for the survey, scope, responsible professional and applicable criteria.
Risk control helps insureds reduce the likelihood and severity of loss. Connect engineering assessments, findings, recommendations, follow-up and verified control effectiveness to underwriting and the living risk record.
A composable insurance solution design; professional engineering judgments, approved criteria and safety-critical verification remain the responsibility of qualified teams.
Connect inspections, loss-prevention recommendations, corrective actions and underwriting context across the insured's entire lifecycle.
Use account history, locations, prior findings, loss experience, business changes and renewal dates to prioritize survey work.
Record the reason for the survey, scope, responsible professional and applicable criteria.
Capture survey reports, photographs, measurements, interviews, equipment records and supporting documents. Record reported versus independently verified information.
Attribute each observation to the source and inspection context; route ambiguities to a qualified engineer.
Represent hazards, potentially affected assets, control condition, frequency/severity estimates, uncertainty and applicable engineering standards.
Use approved engineering methods and versioned criteria; avoid equating model confidence with safety.
Create prioritized recommendations with action owner, timing, acceptance criteria, cost estimates where supplied and dependencies. Distinguish advice from authorized contractual conditions.
Track acceptance, deferral, dispute, due dates, revised plans and evidence of implementation.
Review remediation documentation, testing, photographs, site visits and qualified sign-off. Monitor recurrence, deterioration or changes.
Separate completed action from verified control effectiveness. Retain the evidence and reassess dependent risk records.
Refresh recommendations and assessments with material new observations, claims and operating changes.
Route relevant underwriting review under approved policy; never silently change in-force coverage.
Specialist workspaces adapt to the risk control discipline, while the underlying evidence and workflow model remains shared.
Fire detection and suppression, impairment management, hot work, electrical systems, storage, occupancy and business interruption.
Premises, contractor and visitor safety; products and completed operations; incident and corrective action records.
Machine guarding, ergonomics, occupational health, training, incident investigation and loss prevention.
Maintenance, driver training, vehicle records, accident analysis and permitted operational data.
Access management, vulnerability remediation, backup and recovery, security monitoring, incident response and third-party controls.
Flood, wind, wildfire, location vulnerability, critical suppliers, recovery plans and protective measures.
A control is not a checkbox. It has a location, asset, evidence, inspection cycle, required performance, current status and history.
A site survey records that hot-work permits are inconsistently documented. The risk engineer issues a recommendation and acceptance criteria. The twin follows implementation evidence, flags overdue verification and identifies underwriting assessments relying on the control. A later verified finding updates the assessment, not the historical record.
Use agents to reduce document review, coordination and follow-up effort while preserving professional responsibility.
Summarize prior inspections, material changes and unresolved findings with source references.
Extract candidate observations and compare reports; flag conflicting claims and missing data.
Draft proposed measures from approved engineering references and templates for qualified review.
Route tasks, request evidence, track overdue items and manage follow-up with authorized communications.
Evaluate permitted data changes and inspection schedules; flag potential impairments or stale verification.
Assemble the evidence, recommendation history, owner decisions and verification record.
Agents do not certify installations, prescribe unreviewed safety-critical engineering changes or assert that a control is effective without appropriate evidence. Qualified professionals validate advice and verification.
Use metrics that distinguish administrative activity from actual risk improvement.
Compare loss experience and intervention cohorts using approved actuarial methods. Do not infer that a recommendation prevented a loss merely because it was completed.
Compose these workflows with Tethesis and InvariantDB. Integrate existing systems and validate domain rules and controls with your insurance teams.