TETHESIS
Insurance / Risk control
TETHESIS / INSURANCE

Assess the risk.
Help improve it.

Risk control helps insureds reduce the likelihood and severity of loss. Connect engineering assessments, findings, recommendations, follow-up and verified control effectiveness to underwriting and the living risk record.

A composable insurance solution design; professional engineering judgments, approved criteria and safety-critical verification remain the responsibility of qualified teams.

01 / RISK ENGINEERING WORKFLOW

Turn a finding into verified risk improvement.

Connect inspections, loss-prevention recommendations, corrective actions and underwriting context across the insured's entire lifecycle.

01Plan surveyPrioritize exposures and locations
02AssessCollect and validate evidence
03RecommendDefine measures and rationale
04RemediateAssign and follow up
05VerifyValidate effectiveness and reassess
01

Inspection planning

Use account history, locations, prior findings, loss experience, business changes and renewal dates to prioritize survey work.

CONTROL / OUTPUT

Record the reason for the survey, scope, responsible professional and applicable criteria.

02

Field and remote assessments

Capture survey reports, photographs, measurements, interviews, equipment records and supporting documents. Record reported versus independently verified information.

CONTROL / OUTPUT

Attribute each observation to the source and inspection context; route ambiguities to a qualified engineer.

03

Hazard evaluation

Represent hazards, potentially affected assets, control condition, frequency/severity estimates, uncertainty and applicable engineering standards.

CONTROL / OUTPUT

Use approved engineering methods and versioned criteria; avoid equating model confidence with safety.

04

Recommendations and remediation

Create prioritized recommendations with action owner, timing, acceptance criteria, cost estimates where supplied and dependencies. Distinguish advice from authorized contractual conditions.

CONTROL / OUTPUT

Track acceptance, deferral, dispute, due dates, revised plans and evidence of implementation.

05

Verification and closeout

Review remediation documentation, testing, photographs, site visits and qualified sign-off. Monitor recurrence, deterioration or changes.

CONTROL / OUTPUT

Separate completed action from verified control effectiveness. Retain the evidence and reassess dependent risk records.

06

Renewal and portfolio feedback

Refresh recommendations and assessments with material new observations, claims and operating changes.

CONTROL / OUTPUT

Route relevant underwriting review under approved policy; never silently change in-force coverage.

02 / DISCIPLINES

A common model across different hazards.

Specialist workspaces adapt to the risk control discipline, while the underlying evidence and workflow model remains shared.

Property protection

Fire detection and suppression, impairment management, hot work, electrical systems, storage, occupancy and business interruption.

Casualty and general liability

Premises, contractor and visitor safety; products and completed operations; incident and corrective action records.

Worker safety

Machine guarding, ergonomics, occupational health, training, incident investigation and loss prevention.

Fleet and transportation

Maintenance, driver training, vehicle records, accident analysis and permitted operational data.

Cyber

Access management, vulnerability remediation, backup and recovery, security monitoring, incident response and third-party controls.

Natural hazards and resilience

Flood, wind, wildfire, location vulnerability, critical suppliers, recovery plans and protective measures.

03 / RISK TWIN

Follow a control over its lifetime.

A control is not a checkbox. It has a location, asset, evidence, inspection cycle, required performance, current status and history.

CAPABILITYDESIGNED CONTROL
Control definitionType, asset or location, approved criteria, assessment method and dependencies.
ObservationReported, observed or independently verified status, source, time and uncertainty.
FindingHazard or deficiency, affected exposure, severity and supporting evidence.
RecommendationApproved advice, priority, owner, due date and acceptance criteria.
VerificationSelf-attestation, documentation, test or qualified sign-off; record which was used.
ImpairmentNew or changed condition with impact links, review requirements and unresolved status.
Residual riskUpdated assessment using approved analytical methods and verified control state.

Example: hot-work program

A site survey records that hot-work permits are inconsistently documented. The risk engineer issues a recommendation and acceptance criteria. The twin follows implementation evidence, flags overdue verification and identifies underwriting assessments relying on the control. A later verified finding updates the assessment, not the historical record.

04 / AGENTIC RISK CONTROL

Assist the engineer, not replace the engineer.

Use agents to reduce document review, coordination and follow-up effort while preserving professional responsibility.

Survey preparation

Summarize prior inspections, material changes and unresolved findings with source references.

Evidence triage

Extract candidate observations and compare reports; flag conflicting claims and missing data.

Recommendation drafting

Draft proposed measures from approved engineering references and templates for qualified review.

Remediation coordination

Route tasks, request evidence, track overdue items and manage follow-up with authorized communications.

Control monitoring

Evaluate permitted data changes and inspection schedules; flag potential impairments or stale verification.

Review packages

Assemble the evidence, recommendation history, owner decisions and verification record.

Safety-critical boundary

Agents do not certify installations, prescribe unreviewed safety-critical engineering changes or assert that a control is effective without appropriate evidence. Qualified professionals validate advice and verification.

05 / MEASUREMENT

Measure risk-control operations and outcomes.

Use metrics that distinguish administrative activity from actual risk improvement.

CAPABILITYDESIGNED CONTROL
OperationalSurvey cycle time, recommendation aging, outstanding follow-ups, verification backlog.
Evidence qualityInspection completeness, missing evidence, contradictory findings, stale control assessments.
Risk improvementVerified closure, repeat findings, control impairment frequency and approved residual-risk measures.
PortfolioCommon hazard clusters, unresolved material findings, location concentrations and loss trends.
GovernanceReview rates, recommendation overrides, permission failures, unverified closures and traceability.

Validate outcomes

Compare loss experience and intervention cohorts using approved actuarial methods. Do not infer that a recommendation prevented a loss merely because it was completed.

One connected insurance record.

Compose these workflows with Tethesis and InvariantDB. Integrate existing systems and validate domain rules and controls with your insurance teams.