TETHESIS
Solutions / Engineering
TETHESIS / ENGINEERING AND MANUFACTURING

Understand change.
Preserve engineering integrity.

Connect requirements, designs, components, tests, procedures and operational evidence. Understand what a change affects, evaluate alternatives, and coordinate the work required for an authorized release.

A composable engineering solution architecture built on InvariantDB's implemented capabilities. Domain-specific integrations, qualification criteria and safety-critical workflows require qualified validation.

01 / ENGINEERING INTELLIGENCE

Connect the engineering record.

Engineering work produces a network of requirements, designs, parts, procedures, tests, evidence, approvals and deployed configurations. A governed record makes the relationships and changes explicit across existing engineering systems.

Requirements and design

Link requirements, interfaces, design decisions, alternatives and verification plans to their sources and versions.

Change assurance

Identify affected artifacts and decisions when a requirement, component, procedure or external obligation changes.

Verification and validation

Connect test cases, results, evidence, defects, applicable configurations and acceptance criteria.

Configuration management

Track approved baselines, deviations, releases, as-designed and as-built records, and effective dates.

Supply chain and quality

Connect suppliers, components, qualifications, nonconformances, corrective actions and impacted assemblies.

Safety and operational assurance

Link hazards, control measures, inspections, procedures, incidents and documented evidence of review.

02 / CHANGE ASSURANCE

Change a requirement. Know what must change with it.

A change proposal should reveal its consequences before approval. Traverse explicitly recorded derivation and dependency links; identify what needs review, not just what text needs updating.

01ProposeRecord baseline and proposed revision
02AnalyzeTrace affected dependencies
03EvaluateReview isolated alternatives
04AuthorizeApprove revised work and release
05VerifyRecord validation and outcomes
01

Pin the baseline

Select the current or historical requirement, configuration and source revisions.

CONTROL / OUTPUT

Record both valid and recorded time. Preserve the original baseline.

02

Find affected artifacts

Traverse recorded links from changed requirements to designs, tests, procedures, supplier commitments and dependent approvals.

CONTROL / OUTPUT

Mark derived work stale or in need of reassessment under configured policy; flag gaps where traceability is incomplete.

03

Evaluate alternatives

Use an isolated graph overlay or transaction-based simulation to compare a proposed specification or design change.

CONTROL / OUTPUT

Call approved simulation and analysis tools for physics or performance. Keep hypothetical outputs separate from authoritative state.

04

Coordinate reassessment

Create scoped tasks for responsible engineering, quality, safety and operational specialists.

CONTROL / OUTPUT

Use task claims, leases, revision checks and review workflows to coordinate concurrent work.

05

Release with evidence

Capture updated artifacts, test results, qualified approvals and configuration applicability.

CONTROL / OUTPUT

Guard final protected writes against changed evidence or authorization. Integrate approved PLM, ALM or deployment workflows.

03 / WORKED EXAMPLE

A component substitution crosses the organization.

Consider a fictional supplier discontinuing a qualified electrical component used in several assemblies. A substitute may appear equivalent, but engineering qualification is not determined by semantic similarity alone.

Supplier notification

Component A discontinued · source revision recorded

↓
Assemblies

Affected BOMs and variants

Requirements

Interface and environmental constraints

Qualification

Test cases and acceptance criteria

Procedures

Manufacturing and inspection steps

Safety

Hazard analysis and safeguards

Releases

Approved configurations and field units

↓
Change proposal and review

Compare candidate component in isolation · qualify · approve · release

Preserve the earlier engineering record

The notification triggers affected work, not retroactive invalidation of every historical configuration. Qualified specialists assess which approvals remain applicable, which tests must be repeated and how to handle already deployed units. The system records that decision and its evidence.

04 / AGENTIC ENGINEERING TWINS

Persistent context for assets, systems and configurations.

An engineering twin can connect a product, component, asset or operational system to its documented design, actual configuration, current condition, requirements, work and evidence.

System twin

Model subsystems, interfaces, requirements, dependencies and accepted configurations.

Component twin

Track approved parts, suppliers, qualification, substitutions, test history and affected assemblies.

Asset twin

Connect installed equipment, operating context, inspection, maintenance, incidents and condition observations.

Process twin

Represent production procedures, quality controls, work instructions, verification and change history.

Requirement twin

Follow a requirement through design, implementation, evidence, acceptance and later revisions.

Assurance twin

Track hazards, obligations, control evidence, verification status, exceptions and accountable owners.

Agentic does not mean autonomous engineering approval

Specialist agents can examine documents, compare revisions, propose traceability links, identify impacted work and coordinate reviews. Engineers and approved systems remain responsible for design, qualification, safety and release decisions.

05 / GOVERNANCE

Guard the release, not just the analysis.

Engineering judgment and release authority are distinct. A model's recommendation is not a qualification result or an authorization to change a physical system.

CHANGE OR DOMAINANALYSIS AND CONTROL
TraceabilityRecord source revisions and the relationships used in derived results. Report unresolved or unverified links.
Qualified evidenceDistinguish simulated, observed and independently verified results. Pin test configuration, methods and reviewer.
StalenessIf a dependency changes, identify affected work and enforce revision conditions for protected commits where configured.
AuthorizationScope roles by program, subsystem, artifact and decision; require configured approvals and separation of duties.
External executionPLM, ERP, ALM, CI and operational systems remain authoritative for their actions. Use scoped adapters and reconcile outcomes.
Historical replayRecover retained approved configurations and evidence as known at a specified time. Access and retention restrictions apply.
Integrity and privacyUse appropriate cryptographic verification, retention, access controls and regional policies for confidential engineering information.
06 / INTEGRATION AND ADOPTION

Keep existing engineering tools. Connect their decisions.

Begin with an engineering workflow where traceability and change review are already costly. Integrate the existing source systems; avoid rebuilding CAD, simulation, PLM, MES or ALM.

Knowledge and retrieval

Ingest permitted specifications, requirements, code, procedures and evidence; link semantic retrieval to explicit graph relationships.

Change feed and reconciliation

Track source revisions and ingestion checkpoints; detect missing or conflicting updates.

Approved analytical tools

Integrate engineering simulation, testing and verification tools through validated adapters.

Review workspaces

Provide affected-artifact lists, evidence comparisons, approval queues and unresolved dependency gaps.

Release integration

Coordinate authorized changes with existing configuration and release systems.

Measurement

Establish baselines for review time, traceability coverage, missed dependencies, stale approvals and evidence completeness.

Change with evidence.

Apply the same governed foundation to engineering, manufacturing, quality and operational assurance.