Evidence
Establish the relevant facts and unknowns.
Combine approved rules, analytical models, agentic reasoning and professional judgment. Preserve the actual basis of each decision, evaluate alternatives and authorize consequential actions explicitly.
From the first observation to the recorded outcome, connect the entire decision lifecycle on one governed foundation.
A decision is a consequential judgment made in a particular context. A reliable system needs the evidence that was used, the criteria that applied, the actual factors that drove the result, and the authority under which any resulting action was performed.
Establish the relevant facts and unknowns.
Apply reviewed criteria and record actual factors.
Confirm current scope, revisions and required approvals.
Perform only the permitted operation.
Record what committed or happened, including uncertainty.
Identify affected decisions when new evidence arrives.
A recommendation can exist without approval. An approved decision can exist without execution. A committed database change does not establish an external provider outcome. Preserve each independently, and link them through the workflow.
Not every decision needs an LLM. Compose deterministic rules, validated statistical models, conventional optimization, specialist analysis and professional judgment under the same explicit decision contract.
Eligibility, thresholds, approved procedures, authority limits and hard constraints. Evaluate applicable versioned criteria, not an improvised interpretation.
Repeatable evaluation given the same complete inputs and rule version. Unknown or inapplicable must not silently become false.
Approved risk, actuarial, financial, engineering or other analytical models. Integrate results from existing domain services.
Record model version, inputs, output, uncertainty, applicable scope and validation evidence. Engine integrity does not validate the model.
Explore alternatives under documented objectives, constraints and validated assumptions; use exact or approximate methods as appropriate.
Record objective, feasible set, assumptions, solver configuration, result and limitations. A proposed optimum is not an authorization.
Gather evidence, examine complex documents, resolve candidate relationships, compare alternatives, draft recommendations and request missing information.
Link material assertions and outputs to permitted sources, distinguish inference from fact, and retain actual tool results and execution context.
Route exceptions, ambiguity, material uncertainty and decisions that require a qualified specialist.
Record reviewer identity, rationale, scope, exceptions, applicable criteria and approval requirements. Do not replace prescribed professional review with model confidence.
Explainability is not a persuasive paragraph generated after the event. Preserve structured, reviewable decision facts as the work takes place. Use the recorded basis to support appropriate explanations, appeals and examination.
An agent, rule engine or analyst may be able to evaluate a decision without being entitled to commit the resulting change. An independently enforced authority boundary is essential.
Typed result, evidence and proposed action
Identity · Scope · Freshness · Approval
Commit, hold, refuse or reconcile
The configured conditions are satisfied and the protected write succeeds.
A configured approval requirement prevents execution until resolved.
A condition, authority or other enforced contract is not satisfied.
An external action has an uncertain outcome. Investigate rather than assuming failure or blindly retrying.
When material evidence changes after an evaluation, the relevant decision may need to be reconsidered before a protected action can proceed. The record must preserve what was originally known and what changed.
A fictional commercial property account is assessed using a verified protection survey, a schedule of values and approved underwriting criteria. After an authorized review, the insurer prepares a quote. Before binding, new evidence indicates a material impairment to fire protection.
The correct response is not to rewrite the original decision or assume the quote is still authorized. Reassess the affected decision against current evidence and the approved authority policy.
The actual evidence, criteria, proposal and approval are retained.
Record a new observation and distinguish it from a verified engineering conclusion.
Identify affected decision inputs; a protected operation must satisfy current revision and approval checks.
Qualified review evaluates material changes and obtains any required authorization. Preserve both decisions and their relationship.
Use both valid time and recorded time to recover the context of a historical decision. Evaluate proposed changes in isolated state without treating a scenario as fact or permission to act.
What evidence and rules applied as known at the selected recorded instant?
What would the result be under a proposed rule or changed assumption?
* Hypothetical inputs and outcomes are labelled, isolated and never promoted automatically.
Retrieve retained evidence, relationships and criteria at selected valid and recorded coordinates. Preserve late-arriving corrections without silently changing the original recorded view.
Subject to permissions, retained history, erasure and query limits. Reconstructing context is not a promise to reproduce a nondeterministic model's exact output.
Evaluate new appetite, credit, eligibility, control or engineering rules against a pinned case set. Avoid look-ahead leakage by using the appropriate historical evidence.
Compare outcomes, exceptions, required approvals and affected dependencies; qualified reviewers validate before prospective activation.
Explore hypothetical evidence, state changes, relationships, thresholds or constraints using isolated overlays or supported transaction simulations.
Use approved models and document assumptions. A counterfactual result is not causal proof, a forecast guarantee or a live decision.
Rules, models and policies are themselves governed records. Their release lifecycle should be as explicit as the decisions they influence.
Identify the rule or model owner, intended use, applicable domain, jurisdiction, version, scope, effective dates and allowed inputs.
Exercise representative cases, boundaries, missing data, conflicting rules, prohibited inputs, override paths and regression behavior.
Trace affected decisions, procedures, agents, controls and open proposals. Compare candidate criteria with existing approved versions.
Record required review, separation of duties, deployment version, prospective effective time and rollback strategy.
Assess quality, exceptions, overrides, drift, consistency and appropriate outcome measures using validated methods and qualified reviewers.
Preserve historical versions, investigate challenged decisions and route reevaluation. Avoid silently rewriting past criteria or outcomes.
Compose Tethesis capabilities around the organization's existing policies, domain services and operational systems. The platform and InvariantDB provide foundational mechanisms; domain-specific decision services and authority policies are implemented and validated for each deployment.
Underwriting · Credit · Engineering · Contract review · Assurance · Enterprise operations
Knowledge · Decision · Agentic · Execution · Artifact · Assurance
Versioned graph, vector and memory · Typed decisions · Evidence provenance · Transactions · Scoped access · Dependency awareness · Isolated evaluation
Apply decision intelligence to consequential workflows without pretending their domain requirements are interchangeable.
Underwriting eligibility, referral, terms, risk engineering, claims review and delegated authority.
Explore solution →02 / INDUSTRYCredit decisions, approved advisory criteria, counterparty assessments, exceptions and authorized execution.
Explore solution →03 / INDUSTRYDesign alternatives, qualification, requirements change, release decisions and evidence-based approvals.
Explore solution →Source-linked research, applicability review, contract interpretations and qualified approval of consequential legal judgments.
Evidence and protocol review, research decisions and clinical decision support with appropriate qualified oversight.
Vendor selection, procurement approvals, exceptions, service change decisions and accountable operational workflows.
Select a workflow with meaningful decision volume, review burden or consequences of error. Establish the decision contract, then expand automation as evidence quality, criteria, authority and outcomes are validated.
Define subject, outcome types, material evidence, actual reasons, rule versions, roles and review responsibilities.
Measure evidence completeness, decision traceability and unresolved uncertainty.
Compare deterministic rules, approved model outputs and specialist recommendations against representative, reviewed cases.
Test missing data, contradictory evidence, exceptions, domain validity and appropriate fairness measures.
Add durable work, scoped identities, revision checks, approval gates and clear refusal states.
Test stale evidence, lost leases, denial, concurrent changes and approval invalidation.
Integrate existing authoritative external systems and introduce narrow permitted actions with reconciliation and supervision.
Test duplicate requests, ambiguous outcomes, recovery, audit evidence and release criteria before expanding autonomy.
Track review effort, processing time, evidence completeness, exception rates, confirmed errors, overrides, appeals, stale decisions, authorization refusals and verified outcomes. Establish baselines, appropriate cohorts and acceptance criteria with qualified owners.
Start with a consequential decision. Connect the evidence, criteria, authority and outcomes that make it accountable.