TETHESIS
Solutions / Decision intelligence
TETHESIS / DECISION INTELLIGENCE

Decisions grounded in evidence.
Actions governed by authority.

Combine approved rules, analytical models, agentic reasoning and professional judgment. Preserve the actual basis of each decision, evaluate alternatives and authorize consequential actions explicitly.

From the first observation to the recorded outcome, connect the entire decision lifecycle on one governed foundation.

From evidence to accountable outcomeEvidence and approved criteria converge into a decision record. Independent authorization determines whether a proposed action may proceed. A recorded outcome feeds new evidence.EVIDENCEObserved · verifiedCRITERIARules · modelsCONTEXTTime · scopeDECISION RECORDActual factors · Evidence · Proposed outcomeAUTHORIZATIONIdentity · Scope · Freshness · ApprovalRECORDED OUTCOMECommit · Hold · Refuse · ReconcileFEEDBACK / NEW EVIDENCE
A decision is an evidence-linked record. Authority is a separate control.
01 / DECISION CONTRACT

A decision is more than an answer.

A decision is a consequential judgment made in a particular context. A reliable system needs the evidence that was used, the criteria that applied, the actual factors that drove the result, and the authority under which any resulting action was performed.

01

Evidence

Establish the relevant facts and unknowns.

02

Judgment

Apply reviewed criteria and record actual factors.

03

Authorization

Confirm current scope, revisions and required approvals.

04

Execution

Perform only the permitted operation.

05

Outcome

Record what committed or happened, including uncertainty.

06

Reassessment

Identify affected decisions when new evidence arrives.

Outcomes and changed evidence feed future evaluation. The historical decision is retained.

Do not conflate the records

A recommendation can exist without approval. An approved decision can exist without execution. A committed database change does not establish an external provider outcome. Preserve each independently, and link them through the workflow.

02 / REASONING METHODS

Use the right intelligence for the decision.

Not every decision needs an LLM. Compose deterministic rules, validated statistical models, conventional optimization, specialist analysis and professional judgment under the same explicit decision contract.

01

Deterministic rules

Eligibility, thresholds, approved procedures, authority limits and hard constraints. Evaluate applicable versioned criteria, not an improvised interpretation.

DECISION CONTRACT

Repeatable evaluation given the same complete inputs and rule version. Unknown or inapplicable must not silently become false.

02

Statistical and predictive models

Approved risk, actuarial, financial, engineering or other analytical models. Integrate results from existing domain services.

DECISION CONTRACT

Record model version, inputs, output, uncertainty, applicable scope and validation evidence. Engine integrity does not validate the model.

03

Optimization and search

Explore alternatives under documented objectives, constraints and validated assumptions; use exact or approximate methods as appropriate.

DECISION CONTRACT

Record objective, feasible set, assumptions, solver configuration, result and limitations. A proposed optimum is not an authorization.

04

Agentic reasoning

Gather evidence, examine complex documents, resolve candidate relationships, compare alternatives, draft recommendations and request missing information.

DECISION CONTRACT

Link material assertions and outputs to permitted sources, distinguish inference from fact, and retain actual tool results and execution context.

05

Professional judgment

Route exceptions, ambiguity, material uncertainty and decisions that require a qualified specialist.

DECISION CONTRACT

Record reviewer identity, rationale, scope, exceptions, applicable criteria and approval requirements. Do not replace prescribed professional review with model confidence.

03 / EXPLAINABLE DECISIONS

Explain the decision by exposing its actual basis.

Explainability is not a persuasive paragraph generated after the event. Preserve structured, reviewable decision facts as the work takes place. Use the recorded basis to support appropriate explanations, appeals and examination.

ILLUSTRATIVE STRUCTURE / NOT AN API SCHEMA
Decision identityType · Subject · Status · Version
Evidence pinsSource IDs · Revisions · Valid / recorded coordinates
Applicable criteriaRule and model versions · Scope · Exceptions
Actual factorsRelevant inputs · Results · Reason codes · Uncertainty
JudgmentProposed or selected outcome · Reviewer · Rationale
Authority and outcomeApproval · Action intent · Commit or provider receipt
QUESTIONRECORDED BASIS
Can we see the sources?Link decision factors to the evidence actually used, within access and retention boundaries. Do not imply every linked source was verified.
Can we identify the criteria?Retain the applied rule, model, procedure and policy versions. Record missing criteria or inapplicable conditions explicitly.
Can we see the actual reason?Capture structured outcomes and factors at evaluation. Distinguish faithful summaries from generated retrospective narratives.
Can someone contest it?Route disputed facts, requested corrections, exceptions or appeals through appropriate review; preserve earlier decisions and subsequent resolutions.
04 / AUTHORITY AND EXECUTION

Intelligence is not permission.

An agent, rule engine or analyst may be able to evaluate a decision without being entitled to commit the resulting change. An independently enforced authority boundary is essential.

PROPOSEDecision service

Typed result, evidence and proposed action

AUTHORIZEIndependent policy gate

Identity · Scope · Freshness · Approval

EXECUTEGuarded operation

Commit, hold, refuse or reconcile

Commit

The configured conditions are satisfied and the protected write succeeds.

Hold

A configured approval requirement prevents execution until resolved.

Refuse

A condition, authority or other enforced contract is not satisfied.

Reconcile

An external action has an uncertain outcome. Investigate rather than assuming failure or blindly retrying.

BOUNDARYENFORCEMENT
Scoped identityUse individual principals, restricted roles and delegated credentials. Separate analysis, review and execution rights.
Current evidenceUse supported revision conditions and covered tracked read validation at commit. Re-evaluate when relevant inputs or criteria have changed.
Concurrent workUse leases with fencing and supported transactional boundaries for task coordination and protected state changes.
Approval scopeUse configured approval policies and separation of duties. An application must bind authorization to the relevant proposal, evidence, criteria and permitted action.
External systemsCoordinate approved actions using scoped adapters, idempotency and provider reconciliation. Do not claim exactly-once effects where the external system cannot enforce or prove them.
05 / WORKED EXAMPLE

An approval is not a permanent entitlement.

When material evidence changes after an evaluation, the relevant decision may need to be reconsidered before a protected action can proceed. The record must preserve what was originally known and what changed.

ILLUSTRATIVE / COMMERCIAL UNDERWRITING

The same account. A different evidence set.

A fictional commercial property account is assessed using a verified protection survey, a schedule of values and approved underwriting criteria. After an authorized review, the insurer prepares a quote. Before binding, new evidence indicates a material impairment to fire protection.

The correct response is not to rewrite the original decision or assume the quote is still authorized. Reassess the affected decision against current evidence and the approved authority policy.

DECISION / UW-1042
Evidence
Survey v3 · Values v2
Rules
Appetite v8 · Authority v4
Outcome
Quote proposed
Approval
Scoped to pinned inputs
01 / RECORDED

Original decision

The actual evidence, criteria, proposal and approval are retained.

02 / NEW EVIDENCE

Protection impairment

Record a new observation and distinguish it from a verified engineering conclusion.

03 / DEPENDENCY

Reassessment required

Identify affected decision inputs; a protected operation must satisfy current revision and approval checks.

04 / RESOLUTION

New decision

Qualified review evaluates material changes and obtains any required authorization. Preserve both decisions and their relationship.

06 / HISTORICAL AND COUNTERFACTUAL REASONING

Reconstruct the actual. Evaluate the possible.

Use both valid time and recorded time to recover the context of a historical decision. Evaluate proposed changes in isolated state without treating a scenario as fact or permission to act.

ACTUAL / RECORDED

Historical reconstruction

What evidence and rules applied as known at the selected recorded instant?

Evidence v1Rule v3Decision A
HYPOTHETICAL / ISOLATED

Counterfactual evaluation

What would the result be under a proposed rule or changed assumption?

Baseline ARule v4*Result B*

* Hypothetical inputs and outcomes are labelled, isolated and never promoted automatically.

01

Replay context

Retrieve retained evidence, relationships and criteria at selected valid and recorded coordinates. Preserve late-arriving corrections without silently changing the original recorded view.

DECISION CONTRACT

Subject to permissions, retained history, erasure and query limits. Reconstructing context is not a promise to reproduce a nondeterministic model's exact output.

02

Compare policies

Evaluate new appetite, credit, eligibility, control or engineering rules against a pinned case set. Avoid look-ahead leakage by using the appropriate historical evidence.

DECISION CONTRACT

Compare outcomes, exceptions, required approvals and affected dependencies; qualified reviewers validate before prospective activation.

03

Evaluate alternative actions

Explore hypothetical evidence, state changes, relationships, thresholds or constraints using isolated overlays or supported transaction simulations.

DECISION CONTRACT

Use approved models and document assumptions. A counterfactual result is not causal proof, a forecast guarantee or a live decision.

07 / POLICY AND MODEL LIFECYCLE

Govern the decision logic, not just its output.

Rules, models and policies are themselves governed records. Their release lifecycle should be as explicit as the decisions they influence.

01Draft
02Validate
03Compare
04Approve
05Activate
06Monitor

Ownership and applicability

Identify the rule or model owner, intended use, applicable domain, jurisdiction, version, scope, effective dates and allowed inputs.

Verification and tests

Exercise representative cases, boundaries, missing data, conflicting rules, prohibited inputs, override paths and regression behavior.

Impact and change assessment

Trace affected decisions, procedures, agents, controls and open proposals. Compare candidate criteria with existing approved versions.

Approval and activation

Record required review, separation of duties, deployment version, prospective effective time and rollback strategy.

Monitoring and review

Assess quality, exceptions, overrides, drift, consistency and appropriate outcome measures using validated methods and qualified reviewers.

Correction and retirement

Preserve historical versions, investigate challenged decisions and route reevaluation. Avoid silently rewriting past criteria or outcomes.

08 / DECISION ARCHITECTURE

A common decision record across applications.

Compose Tethesis capabilities around the organization's existing policies, domain services and operational systems. The platform and InvariantDB provide foundational mechanisms; domain-specific decision services and authority policies are implemented and validated for each deployment.

APPLICATIONS
Domain workflows

Underwriting · Credit · Engineering · Contract review · Assurance · Enterprise operations

DECISION
Evidence-linked judgment and authority
Evidence resolutionApplicable criteriaTyped evaluationAuthorizationAction coordinationOutcome & reassessment
PLATFORM
Tethesis composable capabilities

Knowledge · Decision · Agentic · Execution · Artifact · Assurance

FOUNDATION
InvariantDB

Versioned graph, vector and memory · Typed decisions · Evidence provenance · Transactions · Scoped access · Dependency awareness · Isolated evaluation

09 / INDUSTRY APPLICATIONS

The same decision contract. Different consequences.

Apply decision intelligence to consequential workflows without pretending their domain requirements are interchangeable.

Legal and obligations

Source-linked research, applicability review, contract interpretations and qualified approval of consequential legal judgments.

Healthcare and life sciences

Evidence and protocol review, research decisions and clinical decision support with appropriate qualified oversight.

Enterprise operations

Vendor selection, procurement approvals, exceptions, service change decisions and accountable operational workflows.

10 / ADOPTION

Begin with a decision worth getting right.

Select a workflow with meaningful decision volume, review burden or consequences of error. Establish the decision contract, then expand automation as evidence quality, criteria, authority and outcomes are validated.

01

Establish the decision record

Define subject, outcome types, material evidence, actual reasons, rule versions, roles and review responsibilities.

DECISION CONTRACT

Measure evidence completeness, decision traceability and unresolved uncertainty.

02

Validate evaluation

Compare deterministic rules, approved model outputs and specialist recommendations against representative, reviewed cases.

DECISION CONTRACT

Test missing data, contradictory evidence, exceptions, domain validity and appropriate fairness measures.

03

Introduce guarded coordination

Add durable work, scoped identities, revision checks, approval gates and clear refusal states.

DECISION CONTRACT

Test stale evidence, lost leases, denial, concurrent changes and approval invalidation.

04

Enable bounded execution

Integrate existing authoritative external systems and introduce narrow permitted actions with reconciliation and supervision.

DECISION CONTRACT

Test duplicate requests, ambiguous outcomes, recovery, audit evidence and release criteria before expanding autonomy.

Measure decisions, not just model accuracy

Track review effort, processing time, evidence completeness, exception rates, confirmed errors, overrides, appeals, stale decisions, authorization refusals and verified outcomes. Establish baselines, appropriate cohorts and acceptance criteria with qualified owners.

Make decisions that stand up to scrutiny.

Start with a consequential decision. Connect the evidence, criteria, authority and outcomes that make it accountable.