TETHESIS
Platform / Deployment & Operations
TETHESIS / DEPLOYMENT & OPERATIONS

Deploy deliberately.
Operate with evidence.

Choose the right infrastructure and operating boundary. Establish identity, release verification, monitoring, backup and recovery before production.

A practical evaluation guide for hosted and self-hosted deployments.

Separate application and operations planes, durable graph state, observability and independently verified recovery.APPLICATION PLANEScoped HTTP · SDK · MCPDEPLOYMENT BOUNDARYINVARIANTDBGraph A · Graph B · Graph COPERATIONSMetrics · tracesDURABLE STORAGEWAL · snapshots · keysBACKUPSVerified archivesIsolated restore and verification
Separate application and operations planes, durable graph state, observability and independently verified recovery.
01 / DEPLOYMENT MODELS

Choose ownership before topology.

A deployment decision is an agreement about operational responsibilities, not just where a process runs. Hosted service settings, quotas, geography and contractual commitments must be confirmed for the workload.

HOSTED

Hosted service

Connect through the documented interfaces. The existing hosted references describe encrypted disks, TLS, a managed key provider and US hosting without selectable residency. Confirm current feature availability, service terms and recovery arrangements.

SELF-HOSTED

Operator-managed

Operate the licensed engine, network, storage, keys, release updates, monitoring, backups and recovery within your approved environment. Signed licenses are checked locally.

CAPABILITYCONTRACT AND SCOPE
Application ownershipDefine application identities, business rules, approvals, data sources, integration contracts and domain validation.
Infrastructure ownershipAgree who operates compute, storage, encryption, network, secrets, key providers, monitoring, capacity and recovery.
Commercial boundaryConfirm license and features, hosted limits, support, incident notification and any agreed SLA/RPO/RTO. This page does not assert commitments.
02 / TOPOLOGY AND ISOLATION

Choose graph boundaries deliberately.

A single server can host separately governed graphs. Cross-graph calls connect permitted domains across servers and regions. Select ownership and transaction boundaries to match application requirements.

CLIENTS
Applications and workers

Scoped credentials · HTTP / SDK / MCP

SERVER A
Graph A / Graph B

Domain ownership · Graph-scoped transactions · Access controls

SERVER B
Graph C in another permitted boundary

Guarded cross-graph calls · Regional policies · Independent failure handling

STORAGE
Durable data and recovery

WAL · Snapshots · Backups · Key provider

CAPABILITYCONTRACT AND SCOPE
Single serverStart with a topology that meets measured capacity and recovery needs. Design tenant and graph ownership explicitly.
Cross-server accessAuthenticate and authorize each graph boundary. Test unavailable remote graphs and transfer restrictions.
ReplicationDocumented operator-managed Raft clusters and snapshot-streamed read replicas are distinct from remote graph access. The existing replication reference describes single-region clusters; no managed failover is asserted.
AtomicityDo not assume global transactions, automatic sharding, region failover or external atomic commits.
03 / INSTALLATION AND CHANGE

Make a release a controlled change.

Use the actual self-hosted release artifacts, configuration and supported installation instructions. Preserve a verified prior state, test compatibility and plan maintenance windows before changing a production system.

Verify licenseVerify signatureConfigureTestPromoteMonitor
CAPABILITYCONTRACT AND SCOPE
Release integrityVerify SHA-256 hashes, Ed25519 signatures and signed release bindings using the trusted installed verifier. Require signed release verification where configured.
Feature configurationCheck enabled features and licensed graph settings. Do not assume transaction, read-session, change-feed or optional trust-stamp coverage across all versions.
Secrets and key providerStore credentials outside model context, configure TLS and supported authentication, and test durable key availability for sealed data.
Change managementTest schema and data compatibility, backup and restore, required maintenance procedures, rollback eligibility and license behavior against the actual release.
04 / OBSERVABILITY

Observe the engine and the application separately.

Monitor resource consumption, query behavior, durable progress and explicit refusals. An engine's liveness endpoint does not establish full application readiness or external provider health.

CAPABILITYCONTRACT AND SCOPE
LivenessGET /healthz provides documented liveness; add deployment-specific readiness and dependency checks.
MetricsGET /metrics exposes Prometheus metrics for the operator with the applicable scrape credential.
TracingSelf-hosted OpenTelemetry tracing over OTLP when configured; apply scope, redaction and retention rules to trace data.
Query diagnosticsEXPLAIN and EXPLAIN ANALYZE or documented HTTP equivalents; slow-query logging, timeouts, memory admission and rate limits.
Workflow visibilityTrack task state, stale writes, held approvals, lease losses, feed checkpoints, external intents and unknown outcomes separately.
Operator operationsDocumented compaction, warm-up, backup and restore routes and job lifecycle. Confirm privileges, versions and configuration.
05 / BACKUP AND RECOVERY

A backup is not a verified recovery.

Establish the required recovery point and recovery time, then validate against an actual graph, deployment and key configuration. Acknowledged commit durability does not guarantee recovery from arbitrary loss of infrastructure.

BackupRetain safelyRestore in isolationVerify integrityReconcileRelease
CAPABILITYCONTRACT AND SCOPE
Backup scopeCapture the supported graph archive and required configuration, schema, integrity evidence and dependencies. Record compatible versions and timestamps.
Key availabilityConfirm recovery of durable encryption-key infrastructure without defeating erasure or preservation policy. Prior backups can fall outside live subject-key erasure scope.
Restore validationUse documented restore checks, verify graph integrity and compare selected records, historical queries, access rules and relevant indexes.
External stateReconcile consumer checkpoints, outbox records, action intents and provider effects. Do not replay consequential external work indiscriminately.
Disaster recoveryTest loss of process, host, storage and relevant regional dependencies under agreed scenarios. Record actual achieved recovery times and data-loss bounds.

Recovery objectives are measured

Do not publish an RPO, RTO or uptime percentage until it has been established for the deployment and agreed with the responsible parties.

06 / SECURITY OPERATIONS

Protect the operational plane.

Administrative authority, release verification and access to backups deserve the same scrutiny as application queries.

Operator identity

Use separate privileged credentials, review scope and revocation, document exceptional access and log authorized changes.

Network and storage

Configure applicable TLS, network boundaries, encrypted storage, backup protection and restricted administration.

Evidence retention

Retain independent signed anchors, authorized exports and trusted verification keys. Assess coverage and verify regularly.

Data lifecycle

Apply approved retention, erasure and legal hold processes; resolve irreversible WORM and key destruction conflicts before enabling them.

07 / OPERATIONAL RUNBOOKS

Handle failure explicitly.

Define owners, alert conditions, diagnostic steps, permitted interventions and verification before declaring an incident resolved.

CONDITIONRESPONSE DESIGN
Resource refusalInspect admission limits, query plans and workload concurrency; change query or capacity through approved procedures.
Stale write / lease lostDo not blindly retry. Refresh evidence, reacquire authorized work where appropriate and re-evaluate conditions.
Feed interruptionResume from the last confirmed checkpoint under the documented feed contract. Reconcile consumer effects before advancing.
Integrity failureStop reliance on affected records, preserve evidence, investigate using trusted verification and recover from an authorized verified source.
Unknown external outcomeLookup provider state if possible; otherwise route for authorized adjudication. Do not infer failure from a timeout.
Credential compromiseSuspend/revoke affected keys, contain active work, assess recorded access and effects, and rotate as appropriate.
08 / PRODUCTION READINESS

Agree on the operating contract.

A deployment is ready when the responsible teams can show the relevant controls and recoverability, not merely when a service is running.

CAPABILITYCONTRACT AND SCOPE
WorkloadRepresentative capacity, query latency, concurrency and failure tests.
SecurityIdentity, access, network, encryption, key lifecycle and incident ownership.
RecoveryVerified backup/restore, measured recovery targets, independent evidence and reconciliation.
ReleaseVerified artifacts, feature matrix, compatibility checks and approved release gates.
ResponsibilityOperational owner, support and escalation, documented commitments and domain acceptance.

Operate the system you have verified.

Validate the actual configuration and workload before expanding into production.